Calculate Quantity of Steel for Footing - Civil Way to Learn

May 07, 2020 · 1.) Calculate the steel quantity of an X-direction bar which is parallel to it for top jali. 2.) Calculate the steel quantity of a Y-direction bar which is parallel to it for top jali. Therefore Steel Quantity of Square Pad footing (Q) :Q = Qb + Qt. Q = 22.22 + 22.22 = 44.44 kg = 0.044 tonne. How To Calculate Quantity Of Steel For RCC Beam,Column Following Are The Steps To Calculate The Quantity Of Steel For RCC Slab:1- Prepare a bar bending schedule in order to classify different shapes of bars (bent up bar, straight anchor bar, bar, curtail bar, etc) and diameters. 2- List down all the shapes of bars from the drawing. 3- Count the number of bars of each of those shapes. 4- Then calculate the cutting length of each of those bars.

How To Calculate Quantity Of Steel Per M³ For Slab, Lintel

Column. Minimum percentage of steel =0.8% Quantity of steel = (0.8/100) x 1 = 0.008 m³ Weight of steel = 0.008 x 7850 = 62.80 kg/m³. Maximum percentage of steel =6.0% Quantity of steel = (6.0/100) x 1 = 0.06 m³ Weight of steel = 0.06 x 7850 = 471 kg /m³. Foundation. Minimum percentage of steel =0.50% Quantity of steel = (0.50/100 How To Calculate Steel Quantity For RCC Beam, Column And 10. Now users can add the weight for getting the total steel quantity. Minimum % of steel. 1. For beam (teinsion reinforcement) 2. As = 0.85 bd / fy of gross cross section area 3. For slab = 0.12% of total area 4. For column = 0.8% of cs area . Maximum % of steel. 1. For beam = 4% of cross section area. 2. For slab = 4% of cross section area. 3. How do you calculate steel quantity for columns and beams Feb 24, 2021 · Calculating the top surface area and multiplying it with the depth or height of the column. Volume of Concrete = 0.6×0.4×3= 0.72m3 Volume of Circular column = r2 x 3 = 3.14 x 0.252 x3 = 0.58m3 Volume of concrete = 1.2x1x0.1 = 0.12m3 Total volume of concrete required for footing= 0.32+0.12=0.44m3

How to Calculate Quantity of Steel in RCC Slab, Column

Calculation of Slab Steel. Spacing in slab bar c/c 150 mm. We have to use a main and cross 10 mm bar in the slab Before calculating. Beam length from Grid-(L M) is 7443 mm and Grid-(1 2) 5320 mm as given. Width of the slab is 7443 that is the Width of two slabs for calculating S2 slab steel divide the width of 2 then we will get Width How to Calculate Slab Steel Quantity from Drawing BBS of Weight of bar in kg/meter should be calculated as (d2 ÷ 162) where d is the diameter of bar in mm. L for column main steel in footing should be considered as minimum 30cm/as specified. For bent up bar add 0.42d in a straight length of the bar whered is the clear depth of beam/slab. How to Calculate Steel Quantity Steel Quantity FormulaAssessment of steel quantity is a vital expertise of a civil engineer. Each civil engineer should be acquainted with the technique of computation of steel quantity out of drawing. Information needed for assessment of steel quantity:Plan of element or section. (Beam, Slab, Foundation and Column) Elevation as well as section specifications.

How to Calculate quantity of steel in one way slab

Oct 19, 2017 · The one-way slab steel quantity calculation is done according to its supporting conditions. The one-way slab is supported on two beams and then to the columns of the building. The bars we use in the Tension zone of the slab is called Bent up bars. Technically in the slab, we give two different names of these bars (Main and distribution bar). How to Load Calculation on Column, Beam, Wall & Slab How to Calculate Load on Beam. 300 mm x 600 mm excluding slab. Volume of Concrete = 0.30 x 0.60 x 1 =0.18 m³; Weight of Concrete = 0.18 x 2400 = 432 kg; Weight of Steel (2%) in Concrete = 0.18 x 2% x 7850 = 28.26 kg; Total Weight of Column = 432 + 28.26 = 460.26 kg/m = 4.51 KN/m Steel Quantity Calculator Steel Weight Calculator Steel quantity = Member type×Concrete qauntity Steel quantity = Member type × Concrete qauntity Steel quantity =80×30 Steel quantity = 80 × 30 Total Quantity = 2400.00 kg or 2.40 ton What is Steel Qauntity calculation?

Volume of concrete for slab, beam, footing, Column

Apr 25, 2018 · A slab is in the shape of a rectangle, In order to calculate the volume of concrete required for the slab, find out the surface area of the slab and then multiply it with the depth/thickness of slab as shown in fig. From the above fig Length = 6m, Breadth = 5m and thickness/depth of the slab = 0.15m.Calculate Steel Quantity in Column Footing ? With 1 ExampleOct 15, 2017 · Cutting Length of one Footing Main Bar:Length = {Total length 2 (Half diameter of the bar + Clear cover) + 2 (Thickness of the slab Bottom and Top clear cover Diameter of the bar Half diameter of the bar)}. Length = 2 m 2 (0.006 + 0.05) + 2 (0.250 0.075 0.05 0.012 0.006). Length = 2.102 m.